Real-life use cases and examples

Commercial DEM

Commercial DEM simulation showing critical chute design using Rocky software

Commercial DEM: > 8 hours on single GPU



Commercial DEM simulation of a stacker design requiring 4–5 hours processing on a single GPU

Commercial DEM: 4-5 hours on single GPU

Could have taken 3-4 days to go through 4 design concepts



Commercial DEM example of bulk material flow simulation taking 5–6 hours on a single GPU

Commercial DEM: 5-6 hours on single GPU

Would have taken about a week to complete 6 design iterations.


Commercial DEM scalping screen simulation requiring 8 hours to complete a 30-second run

Commercial DEM: 8 hours to complete 30 secs




VeloxSim™

VeloxSim simulation of critical chute design completed in 15 minutes

VeloxSim: ~ 15 minutes

Could have saved a day of engineering time.


VeloxSim simulation of a stacker design processed in 5 minutes per run

VeloxSim: ~ 5 minutes per run

Gone through 4 designs in a day.

Potential savings of 3 engineering days.


VeloxSim bulk material flow simulation with 5–6 design runs in one day

VeloxSim: ~ 5 minutes per run

Gone through 5-6 designs in a day.

Potential savings of 40 engineering hours


VeloxSim scalping screen simulation completing 300 seconds in just 30 minutes

VeloxSim: 30 mins for 300 seconds

VeloxSim was used to cross-check and support the decision making process.